Requirements on Operation, Maintenance and Repair 

Public places

Class III 

Building structure 

Check the building structure at least twice a year, check the safety-related parts 
once a quarter, and make record. Arrange special repair in time once damage is 
found, and notify relevant owners and users. 

Door and window

Make an inspection tour of doors and windows of the public places in 
the building, keep the glass and door-window accessories intact, and 
enable doors and windows to be opened and closed flexibly without 
abnormal sound. 

Wall, roof and floor

 in the building 

The plastering of the wall and the roof is not flaked. The facing bricks 
and the floor tiles are flat without peeling and defects.

Pipeline, drainage 

ditch and roof 

Clean and dredge the drain gutter on the roof and the drainage pipes inside
 and outside the building once a month, so as to guarantee unblocked water
 drainage (once a half month from June to September), check the roof once
 a half year, and once found the waterproof layer is swelled and fractured and
 the thermal baffle is fractured and defective, repair them in time. 

Enclosing wall 

Inspect the enclosing wall once a half month, and once found it is damaged, 
repair it immediately. There should be no rust on the surface of the enclosing 
wall made of iron fence, and the enclosing wall should be kept intact. 

Roads, sites 

and so on

Inspect roads, pavements, curbstone and manhole once a week, once found 
they are damaged, repair them in time. Keep the pavements flat without damage
 and water logging and keep the curbstone straight without defects. 

Water supply

 system 

Class II 

Variable frequency

 pump 

1. Check the water supply equipments at least three times a week, feed oil to 
the water pump lubricating point once a quarter, remove dust and coat paint
 for the pump room and pipes once a quarter, maintain the water pump once 
a year, and guarantee secondary water supply is normal and the pump room is clean.
2. Regularly clean the water tank and the reservoir twice a year, so as to guarantee 
second water supply quality to comply with national domestic water standard
3. Measure the pressure of the pressure reducing valve in tall buildings twice a year, 
and make records.
4. The cover plates of the water tank and the reservoir should be kept intact and locked.
 Metal protective nets must be mounted on the overflow pipe opening and must be kept intact. 
The exposed water pipes must be maintained to avoid freezing in autumn and winter every year.

Public lighting 

Class II 

Public lamps 

Repair the damaged lamp holder, bulb and switch in time. Keep the lamp intact, 
and keep the lighting rate of corridor lamps and neighborhood lamps beyond 98%. 
Landscape lamp,
 holiday lamps, 
ceiling lamps in
 the lobby 

Keep the lamps intact and the lighting rate beyond 98%. 

Public electric 

cabinet 

Inspect and maintain the indoor and the outdoor public electric cabinets once
 a day. Inspect electric safety once a year to guarantee the safe and normal
 operation of the electric equipment. 

Fire fighting

 system

Class II 

Fire fighting 
facilities and 
equipments 
1. The fire pump is started once a month and recorded, and is maintained once a year to guarantee its normal operation.   
2. The fire hydrants shall be inspected once a month. All fittings in the fire hydrant box should be intact.   
3. Check whether fire alarm functions and alarming functions are normal or not every day.   
4. Test the detector and all control devices once a year. After the fire detector is put into operation for two years, completely clean it once every three years, and replace the unqualified once.   
5. Check the fire hose once a half year, feed lubricating oil on the valve rod, and make drainage check once.  
6. Check the fire extinguisher once a month, and change new one or pressurize once it is invalid immediately. 

Lightning protection

 system 

 

Lightning 

protection 

equipment 

Check the lightning protection equipment twice a year and test the lightning 
protection equipment on the building beyond 18 floors once a year, so as to
 guarantee their performances to comply with relevant national standards. 

Weak current 

system 

Class II 

Building intercom

 system(Visible) 

Regularly debug and maintain the intercome system, guarantee it’s normal 
work in 24 hours, keep the selected calling function normal, keep the walkie-talkie 
(visible) function normal after selected calling, keep voice (video) clear, 
and keep the unlocking functions of the intercome extension and the automatic
 closing functions of the door closer normal. 

Household alarm

Occasionally debug and maintain to guarantee the normal operation in 24 hours. 
The alarm control host of the center should be capable of displaying alarm or fault 
occurrence information accurately, and should simultaneously send out sound and
 light alarm signals. 

Perimeter alarm 

Set up defenses in 24 hours and keep normal operation. Occasionally debug and 
maintain to guarantee the guard line of the system closed without dead zones 
and dead corners. Guarantee the central control room to accurately recognize 
the alarm zone through the display screen, the alarm controller or the electronic map, 
and send out sound and light alarm signals when receiving alarms. 

Monitoring system 

Occasionally debug and maintain to guarantee 24-hour normal operation of the 
monitored equipment, clearly display the facial features of people coming and
 leaving and the license plate number of vehicles clearly, and keep the video
 recording functions normal. 

Electronic guard tour

Set up patrol routes and time according to a need, occasionally debug and
 maintain to guarantee its normal operation, enable the guard tour time, places, 
staffs and sequence to be displayed, filed, inquired and printed normally, 
and keep the violation record hint functions normal. 

Lifting system 

Elevator

 

1. Guarantee the 24-hour operation of the elevator, keep the buttons, lamps and 
other fittings in the lift car intact, and keep the lift car clean. 
2. Entrust professional maintenance unit for regular maintenance, make security
detection every year, and hold valid Safe Use Certificate. The property management 
company should assign special persons for supervising the maintenance of the elevator
 and managing the operation of the elevator. 
3. Once the elevator has common faults, the professional maintenance men shall arrive 
at the scene and make repair in two hours. When somebody is trapped in the elevator 
or other major events happened, the property management staffs shall arrive at the scene
 for emergency treatment in five minutes, and the professional technicians shall arrive at
 the scene for rescue in a half hour. 
4. The elevator should be driven by a special person in the case of no safe closing device, 
automatic weighing sensor or emergent calling device on the elevator door, or is required 
to be driven by a special person by the owners meeting; the driver should stick to his posts
and guarantee the safe operation.